Nifty 5022,450(+0.54%)
Sensex74,200(+0.47%)
Bank Nifty47,800(-0.31%)
USD/INR83.45(+0.06%)
Gold (10g)72,500(+0.35%)
Silver (1kg)88,900(-0.45%)

Pace Digitek Secures INR 702 Cr Contract from DVC for 500 MWh BESS Project in Jharkhand

May 11, 2026
Pace Digitek Secures INR 702 Cr Contract from DVC for 500 MWh BESS Project in Jharkhand

Pace Digitek has announced securing battery energy storage systems (BESS) supply, erection and long-term O&M contracts from Damodar Valley Corporation (DVC) for implementation of a 250 MW/500 MWh BESS project at Maithon, Jharkhand.

The contracts with a combined value of INR 702 crore comprise a supply contract, an EPC services contract and a long-term operation and maintenance (O&M) contract. The scope includes design, engineering, manufacturing-linked supply, installation, testing, commissioning and 12-year comprehensive O&M, along with associated civil, structural and evacuation infrastructure works, the company stated.

Commenting on the development, Venugopal Rao Maddisetty, Chairman and Managing Director, Pace Digitek, said, “This order from DVC reinforces our position in utility-scale energy storage and the strength of our integrated model across manufacturing, EPC and lifecycle services. As energy storage becomes central to renewable integration, we are scaling a manufacturing-led platform aligned to project execution, enabling disciplined delivery, cost efficiency and long-term asset performance. We remain focused on expanding our presence in this high-growth segment.”

This marks the first BESS order win for FY2027, building on the strong momentum achieved in FY2026, where the Company reported energy order inflows of INR 58,147 million, led by increasing traction in BESS and renewable-linked opportunities. The order expands the company’s BESS project portfolio to over 5 GWh, spanning utility-scale storage, renewable integration and grid support applications, stated the company.

Share This News:
#TheBharatMirror#BreakingNews#IndiaNews
SAEL Industries Seeks Power Cost Relief for INR 8,000 Crore Solar Manufacturing Project in Uttar Pradesh

SAEL Industries Seeks Power Cost Relief for INR 8,000 Crore Solar Manufacturing Project in Uttar Pradesh

SAEL Industries, through its subsidiary SAEL Solar P6 Private Limited, has approached the Uttar Pradesh Electricity Regulatory Commission seeking regulatory rel...
May 11, 2026
MNRE Mandates 10-Year Product and 25-Year Performance Warranty for Solar Modules

MNRE Mandates 10-Year Product and 25-Year Performance Warranty for Solar Modules

Ministry of New and Renewable Energy (MNRE) has introduced a standardized framework for warranty management and claims settlement for solar modules deployed und...
May 11, 2026
Roofsol Energy Commissions 4 MWp Rooftop Solar Project for Simpolo Vitrified in Tirupati

Roofsol Energy Commissions 4 MWp Rooftop Solar Project for Simpolo Vitrified in Tirupati

Roofsol Energy has successfully commissioned a 4 MWp rooftop solar project for Simpolo Vitrified at its manufacturing facility in Tirupati, Andhra Pradesh, furt...
May 11, 2026
Ampyr Energy Commission 67.5 MWp Open Access Solar Project in Karnataka

Ampyr Energy Commission 67.5 MWp Open Access Solar Project in Karnataka

Climate Fund Managers and Ampyr Energy have announced the successful commissioning of the Somasamudra Phase 1 solar PV plant in Karnataka. Located in Ballari Di...
May 11, 2026