Nifty 5022,450(+0.54%)
Sensex74,200(+0.47%)
Bank Nifty47,800(-0.31%)
USD/INR83.45(+0.06%)
Gold (10g)72,500(+0.35%)
Silver (1kg)88,900(-0.45%)

JSW Energy Commissions ~250 MW RE Capacity since April’26

May 16, 2026
JSW Energy Commissions ~250 MW RE Capacity since April’26

JSW Energy Limited is pleased to announce that it has successfully commissioned ~250 MW of renewable energy capacity (130 MW of Wind, 69.4 MW of solar, and 50 MW of Tidong Hydro Plant) since April’26. With this, the total installed capacity stands at 13.7 GW.

Post‑acquisition in January’26, Tidong Unit‑I has been commissioned in a record turnaround time, underscoring the Company’s strong execution capabilities and ability to seamlessly integrate acquired assets. This positions us well to capitalise on the ongoing hydro season. Further, the balance two units of Tidong Hydro Plant are expected to be commissioned by June’26.

The share of renewables in the overall capacity stands at 59% constituting wind capacities & solar capacities (including hybrid component) at 3,924 MW and 2,440 MW respectively, and hydro capacity at 1,681 MW.

JSW Energy has a total locked-in generation capacity of 32.1 GW, comprising 13.7 GW operational and 13.8 GW under construction across thermal, hydro, and renewables, with a pipeline of 4.6 GW. The company plans to add ~3 GW of renewable capacity in FY27 and expects to incur a total capex of ~₹20,000 crores in FY27. The company also has 29.6 GWh of locked-in energy storage capacity, comprising pumped hydro storage of 26.4 GWh and battery energy storage systems of 3.2 GWh. The company aims to reach 30 GW of generation capacity and 40 GWh of energy storage capacity by 2030, and to achieve carbon neutrality by 2050.

Share This News:
#TheBharatMirror#BreakingNews#IndiaNews
Skipper Secures New Orders Worth INR 1,265 Crore in T&D Segment

Skipper Secures New Orders Worth INR 1,265 Crore in T&D Segment

Skipper, a manufacturer of power transmission and distribution structures and a major EPC player in 765 kV transmission lines and substation, has announced that...
May 16, 2026
SLR Solar Inaugurates 800 MW Solar PV Module Manufacturing Facility in Rajasthan

SLR Solar Inaugurates 800 MW Solar PV Module Manufacturing Facility in Rajasthan

SLR SOLAR PVT LTD has officially inaugurated its 800 MW solar PV module manufacturing facility in Kishangarh, Rajasthan, marking a major milestone in the compan...
May 16, 2026
Runaya Metsource Expands Critical Metals Output With New Cobalt, Cadmium, Copper Capacities

Runaya Metsource Expands Critical Metals Output With New Cobalt, Cadmium, Copper Capacities

Runaya Metsource, a Vedanta company specialising in circular economy and waste-to-wealth solutions, is expanding its critical metals production platform with ne...
May 16, 2026
Central Electronics Ltd. Commissions 200 MW Solar Module Manufacturing Line in Uttar Pradesh

Central Electronics Ltd. Commissions 200 MW Solar Module Manufacturing Line in Uttar Pradesh

Central Electronics Ltd. (CEL) has commissioned its 200 MW solar module manufacturing line at Sahibabad, Uttar Pradesh. Union Minister of State (Independent Cha...
May 16, 2026